115 MW Campus: Apexa Power’s Flagship Energy Solution

Apexa Power’s 115 MW campus is ready for deployment and scalable to 452 MW, offering electricity at $0.045/kWh. Discover how this project redefines energy efficiency.

Cover Image for 115 MW Campus: Apexa Power’s Flagship Energy Solution

Apexa Power, strengthened by Three Ace Group, proudly presents its 115 MW campus, a flagship project designed for data centers and industrial clients. With a capital expenditure of $90,000 per MW, this facility will be operational in 3–4 months, delivering electricity at $0.045/kWh. The campus features direct turbine access and advanced cooling systems to ensure maximum uptime.

Backed by Three Ace Group’s 4.0 GW gas-fired capacity, the facility guarantees a stable energy supply. Its scalability to 452 MW positions it as a cornerstone for meeting the growing energy demands of digital infrastructure. The project’s engineering prioritizes efficiency and reliability, making it a model for future developments.

Investment Opportunity

Investors can secure a share in this high-return project, benefiting from Apexa Power’s managed infrastructure and government-aligned energy corridors. Contact us at apexapower.com to learn about investment options.