Apexa Power, backed by Three Ace Group, is advancing its 150 MW power generation project, designed to scale to 1 GW. Currently under turbine construction, the facility is set to be operational in 3–6 months post-commissioning in Q1 2026, offering electricity at $0.039–$0.043/kWh. With a capital expenditure of $100,000 per MW, this project leverages Three Ace Group’s gas-fired capacity for cost-effective energy delivery.
The facility is tailored to support data centers and industrial clients, with advanced cooling and turbine redundancy systems ensuring reliability. Its scalability makes it a key asset in Apexa Power’s portfolio, addressing the rising energy demands of digital infrastructure.
Investment Appeal
This project offers investors a first-mover advantage in high-growth energy markets. Contact us at apexapower.com to explore ownership opportunities in this transformative initiative.